Existing Reclosers (40)
Proposed Reclosers (39)
Electric Pole Inspections (0)
2025 Tree Trimming Maintenance (1)
2024 Tree Trimming Maintenance (46)
2023 Tree Trimming Maintenance (47)
2022 Tree Trimming Maintenance (48)
2021 Tree Trimming Maintenance (49)
2020 and Older Tree Trimming Maintenance (50)
Duke Lights (2)
Electric Pole (3)
| Non-Wood Power Pole |
| Non-Wood Security Light Pole |
| Non-Wood Street Light Pole |
| Wood Power Pole |
| Wood Security Light Pole |
| Wood Street Light Pole |
Electric Meter (4)
Capacitor (6)
Transformer (7)
| Single Phase Overhead |
| Single Phase Underground |
| Three Phase Overhead |
| Three Phase Underground |
| Two Phase Overhead |
Generator (8)
Anchor Guy (9)
Surface Structure (10)
| Enclosure |
| In Ground |
| Junction Box |
| Pad |
| Pedestal |
Event Panel (11)
Light (12)
| Decorative Security Light |
| Decorative Street Light |
| Security Light |
| Street Light |
Fuse (14)
Marker (15)
| Dead End |
| Wire Size Changes |
Electric Station (13)
Fault Indicator (16)
Switch (5)
Surge Arrestor (17)
Pushbrace (18)
Underground Structure (19)
OpenPoint (20)
Abandoned Electric Line Segment (21)
Busbar (22)
| Busbar |
| Meter Wire |
| Stinger Wire |
Communication Cable (23)
Conduit System (24)
| Duct Bank |
| Trench |
Line Splice (25)
Double Circuits (38)
| 8-2, 8-3 |
| 9-1, 9-2 |
| 10-2, 10-4 |
| 10-4, 11-6 |
| 11-1, 11-4 |
| 11-3, 11-4 |
| 11-5, 11-6 |
8-1 (51)
8-1 UG (52)
8-2 (53)
8-2 UG (54)
8-3 (55)
8-3 UG (56)
9-1 (57)
9-1 UG (58)
9-2 (59)
9-2 UG (60)
9-3 (61)
9-3 UG (62)
10-2 (63)
10-2 UG (64)
10-3 (65)
10-3 UG (66)
10-4 (67)
10-4 UG (68)
10-5 (69)
10-5 UG (70)
11-1 (71)
11-1 UG (72)
11-3 (73)
11-3 UG (74)
11-4 (75)
11-4 UG (76)
11-5 (77)
11-5 UG (78)
11-6 (79)
11-6 UG (80)
Primary Overhead Electric Line (26)
Primary Underground Electric Line (27)
Secondary Overhead Electric Line (28)
Secondary Underground Electric Line (29)
Span Guy (30)
Generator Area (31)
Substation Area (32)
Electric Service Area (33)
| Electric |
|