Underground Gas Leaks (0)
Current Year Leak Survey (35)
2025 Leak Survey (2)
2024 Leak Survey (3)
2023 Leak Survey (4)
2022 Leak Survey (5)
>5 Years Leak Survey (7)
Tap (9)
Meters (10)
Test Stations (11)
| Null |
| 4 Wire |
| Anode |
| Casing |
| End of Line |
| Locating |
| Rectifier |
Leak Clamp (12)
Line Stopper (13)
Pipe Thickness (14)
Gas Valves (21)
| Valve (To be Determined) |
| Non-Critical Valve |
| Critical Valve |
End Line (16)
RTU (18)
Haz Crossing (20)
Insulator (19)
Fitting (17)
Transition (22)
Reducer (23)
Relief (24)
Reg Station (25)
Farm Tap (15)
Riser (8)
Rectifier (26)
CP Sections (27)
| <all other values> |
| 1 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 14-A |
| 14-B |
| 14-C |
| 14-D |
| 15 |
| 15-A |
| 16 |
| 17 |
| 18 |
| 19 |
| 2 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 24 |
| 25 |
| 26 |
| 27 |
| 28 |
| 29 |
| 3 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 34-A |
| 34-B |
| 35 |
| 36 |
| 37 |
| 38 |
| 39 |
| 4 |
| 40 |
| 41 |
| 41-A |
| 42 |
| 43 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| P-1 |
| P-10 |
| P-100 |
| P-102 |
| P-103 |
| P-104 |
| P-105 |
| P-106 |
| P-107 |
| P-109 |
| P-11 |
| P-110 |
| P-111 |
| P-112 |
| P-113 |
| P-114 |
| P-115 |
| P-116 |
| P-117 |
| P-118 |
| P-119 |
| P-12 |
| P-120 |
| P-121 |
| P-122 |
| P-123 |
| P-124 |
| P-125 |
| P-126 |
| P-127 |
| P-128 |
| P-129 |
| P-13 |
| P-130 |
| P-131 |
| P-132 |
| P-133 |
| P-134 |
| P-135 |
| P-136 |
| P-137 |
| P-138 |
| P-139 |
| P-14 |
| P-140 |
| P-141 |
| P-142 |
| P-143 |
| P-144 |
| P-145 |
| P-146 |
| P-147 |
| P-149 |
| P-15 |
| P-152 |
| P-153 |
| P-154 |
| P-155 |
| P-156 |
| P-158 |
| P-159 |
| P-16 |
| P-161 |
| P-162 |
| P-164 |
| P-165 |
| P-166 |
| P-168 |
| P-169 |
| P-17 |
| P-170 |
| P-171 |
| P-172 |
| P-173 |
| P-174 |
| P-175 |
| P-176 |
| P-177 |
| P-178 |
| P-180 |
| P-181 |
| P-182 |
| P-184 |
| P-185 |
| P-186 |
| P-19 |
| P-191 |
| P-194 |
| P-195 |
| P-198 |
| P-199 |
| P-2 |
| P-20 |
| P-200 |
| P-201 |
| P-203 |
| P-206 |
| P-208 |
| P-209 |
| P-21 |
| P-210 |
| P-211 |
| P-212 |
| P-214 |
| P-216 |
| P-217 |
| P-218 |
| P-219 |
| P-22 |
| P-220 |
| P-221 |
| P-222 |
| P-223 |
| P-224 |
| P-225 |
| P-226 |
| P-227 |
| P-228 |
| P-229 |
| P-23 |
| P-230 |
| P-231 |
| P-232 |
| P-233 |
| P-234 |
| P-235 |
| P-236 |
| P-237 |
| P-238 |
| P-239 |
| P-24 |
| P-240 |
| P-241 |
| P-242 |
| P-243 |
| P-244 |
| P-246 |
| P-248 |
| P-249 |
| P-250 |
| P-251 |
| P-253 |
| P-26 |
| P-27 |
| P-28 |
| P-29 |
| P-3 |
| P-30 |
| P-31 |
| P-32 |
| P-33 |
| P-34 |
| P-35 |
| P-36 |
| P-37 |
| P-38 |
| P-39 |
| P-4 |
| P-40 |
| P-41 |
| P-42 |
| P-43 |
| P-44 |
| P-45 |
| P-46 |
| P-48 |
| P-49 |
| P-5 |
| P-50 |
| P-51 |
| P-52 |
| P-53 |
| P-54 |
| P-55 |
| P-56 |
| P-57 |
| P-58 |
| P-59 |
| P-6 |
| P-60 |
| P-61 |
| P-62 |
| P-63 |
| P-64 |
| P-65 |
| P-66 |
| P-67 |
| P-68 |
| P-69 |
| P-7 |
| P-70 |
| P-71 |
| P-72 |
| P-73 |
| P-74 |
| P-75 |
| P-76 |
| P-77 |
| P-78 |
| P-79 |
| P-8 |
| P-80 |
| P-81 |
| P-82 |
| P-83 |
| P-84 |
| P-85 |
| P-86 |
| P-87 |
| P-88 |
| P-89 |
| P-9 |
| P-90 |
| P-91 |
| P-92 |
| P-93 |
| P-94 |
| P-95 |
| P-96 |
| P-97 |
| P-98 |
| P-99 |
| P230 |
| P231 |
| R-1 |
| R-2 |
| R-3 |
| R-4 |
| R1 R4 |
Bridge Attachment (28)
Anode Bed (42)
Gas Main (By Pressure) (29)
| 400 LBS |
| 150 LBS |
| 25 LBS PE |
| 25 LBS STL |
| Unknown |
Gas Main (30)
PSNC Line (31)
Gas Right of Way (32)
| Gas |
Gas Service Line (33)
Leak Survey Sections (40)
| Business District |
| Section 1 |
| Section 2 |
| Section 3 |
| Section 4 |
| Section 5 |
ACI Sections (36)
| Section 1 |
| Section 2 |
| Section 3 |
| Section 4 |
| Section 5 |
Field Notes (38)
|